Namma Metro Phase 3: Route Map, New Stations, & What it Means for Bangalore Real Estate
Namma Metro Phase 3 real estate impact is significant – due to expanding rail connectivity across western, southern, and northern Bangalore.
Namma Metro Phase 3 will add two elevated corridors covering 44.65km and 31 stations. The 32.15km Orange Line will run from J P Nagar 4th Phase in the south to Kempapura in the north along the western stretch of Outer Ring Road (ORR). The 12.5km Grey Line will connect Hosahalli with Kadabagere along Magadi Road – in the west.
The Orange and Blue lines will provide complete metro coverage around the entire Outer Ring Road, and create a full corridor encircling the city.
Namma Metro route map shows interchange points with existing and upcoming lines, linking major commercial and residential hubs. These will impact rental demand, land use, and location choices among homebuyers and investors.
Table of Contents
Namma Metro Phase 3 at a Glance (2026)
| Parameter | Detail |
| Approval date | 16 Aug 2024 |
|
Total route length
|
44.65km |
| Alignment type | Fully elevated |
|
Number of stations
|
31 |
|
J P Nagar 4th Phase to Kempapura
|
32.15km, 22 stations
|
|
Hosahalli to Kadabagere
|
12.50km, 9 stations
|
|
Approved completion cost
|
₹15,611 cr |
| Target opening |
2029, according to the Union Cabinet approval note
|
| Status in 2026 |
Land acquisition and preparatory activity are progressing, while major civil construction is yet to commence
|
Phase 3 vs Phase 3A: Clearing the Confusion
These form two distinct parts of the city’s rapid transit expansion. Phase 3 received Union Cabinet approval on 16 Aug 2024, and comprises the J P Nagar 4th Phase Kempapura and Hosahalli Kadabagere stretches. Its foundation was laid on 10 Aug 2025.
Bangalore Metro Phase 3A refers to the proposed Sarjapur Hebbal Red Line, which received Karnataka govt sanction in Dec 2024 – and is awaiting Union govt clearance following design and cost revisions. The ‘A’ suffix identifies an additional package under the third expansion stage, not a subdivision of the approved Phase 3.
The city’s overall expansion includes distinct alignments, including the route covered in the Hosur Bommasandra Metro Yellow Line guide, which serves the southern industrial belt.
| Parameter | Phase 3 | Phase 3A |
| Route | J P Nagar 4th Phase to Kempapura, Hosahalli to Kadabagere |
Sarjapur to Hebbal
|
| Length | 44.65km | 37.8km |
| Stations | 31 |
27 (Jun 2026 revision)
|
|
Construction type
|
Fully elevated |
23km elevated, 14km underground
|
|
Approval position
|
Union Cabinet approval received in Aug 2024 |
Karnataka sanction received; Union clearance awaited
|
| Estimated cost | ₹15,611 cr |
₹25,999 cr under the revised submission
|
| Main role | Serves western and southern Bangalore through two stretches |
Connects the southeast with city centre and Hebbal in the north
|
5 Interchanges that Rewire the Network
| Station | Lines Connected |
Why it is Important
|
|
J P Nagar 4th Phase
|
Orange, Pink |
Provides a transfer to the Kalena Agrahara Nagawara alignment, connecting the western ORR stretch with Bannerghatta Road and city centre
|
| J P Nagar | Orange, Green |
Opens a north-south transfer towards Silk Institute, Majestic, Yeshwanthpur, and Madavara
|
| Mysore Road | Orange, Purple |
Joins the new alignment with the operational east-west service between Challaghatta and Whitefield
|
|
Sumanahalli Cross
|
Orange, Grey |
Brings the two approved Namma Metro Phase 3 corridors together, allowing transfers between ORR-West and the Magadi Road stretch
|
| Hebbal | Orange, Blue, proposed Red |
Creates a major junction for airport-bound services and the proposed Sarjapur Hebbal alignment, subject to the latter receiving Union approval
|
J P Nagar 4th Phase interchange gains significance from the Metro Pink Line impact on South Bangalore, as it will create a transfer between the Orange and Pink lines.
Construction Status 2026: Tenders, Packages, Timeline
In 2026, Namma Metro Phase 3 moved into procurement, with BMRCL issuing 3 civil tenders valued at ₹4187 cr.
Together, the packages cover ~18.6km: J P Nagar 4th Phase to Kamakya Junction, Hoskerehalli to Nagarabhavi Circle, and Vinayaka Layout to BDA Complex Nagarbhavi, including Sunkadakatte station and depot links.
Work associated with Magadi Road metro near Sunkadakatte forms part of the initial tender package. Each contract carries an execution period of 1460 days. Contractor selection and preparatory activity will determine the start of civil work. Systems installation, trial runs, and safety certification will follow.
The Double-decker Experiment: Metro + Flyover
The double-decker concept gives Namma Metro Phase 3 a distinct engineering feature, by placing a vehicular flyover on the lower deck and rapid transit tracks above it.
BMRCL tender notices describe elevated structures that combine the viaduct, carriageway, and stations across certain sections of both alignments. This stacked arrangement uses one central median for two transit layers, limiting the need for separate elevated structures.
The double decker flyover Bangalore model is intended to let motorists bypass busy junctions while trains operate on an independent level.
What Phase 3 Means for Real Estate, Corridor by Corridor
Magadi Road & Nagarabhavi: The Underserved West Finally Gets Rail
These locales gain their first direct link under Namma Metro Phase 3, bringing Sunkadakatte, Herohalli, Byadarahalli, and Kadabagere into the grid.
J P Nagar & Kanakapura Road Belt: Interchange Premiums in the Established South
Transfers at J P Nagar 4th Phase and J P Nagar place the southern belt near the Pink and Green lines. Interest around J P Nagar metro and apartments in Kanakapura Road is gaining traction, especially for gated communities and premium high-rises.
Transfers through the Pink and Green Lines are influence location assessments for luxury apartments in Bangalore across J P Nagar and nearby localities.
Mysore Road & Hosakerehalli: The Value Corridor
These localities combine Purple Line interchange potential, with links towards Nagarabhavi and western employment clusters.
Namma Metro Phase 3 real estate impact is appearing through housing demand, rental movement, and mixed-use activity. These changes reflect how metro expansion is impacting property values in Bangalore.
Peenya to Hebbal & Kempapura: Industrial North Meets the Airport Line
From Peenya to Kempapura, the alignment passes manufacturing centres, BEL-linked employment areas, Hebbal, and the airport-belt interchange. This integration will broaden rental interest across industrial and commercial hubs, while encouraging organised land use near transit nodes.
Conclusion
With 44.65km of elevated tracks, 31 stations, 5 major interchanges, and integrated flyover sections, the third expansion stage is set to alter movement across western, southern, and northern parts of the city.
Namma Metro Phase 3 real estate impact is unfolding around station catchments – where land use, rental activity, and commercial interest respond to new connectivity initiatives.
Bangalore Metro Orange Line will place areas such as Nagarabhavi, Sunkadakatte, Peenya, Hebbal, and Kempapura on a shared transit framework; while the southern stretch links prominent apartment belts with existing lines.
Apart from station distance and execution timelines, KRERA registration, Guidance Value Bangalore and developer track record can inform property assessments near the proposed route.

For those examining apartments for sale in Bangalore near the route, distance between stops, interchange potential, construction timelines, and developer track record are important factors. The expansion therefore represents a key transit upgrade with significant implications for location selection across the city.
FAQs
What is the route of Orange Line in Bangalore?
The route of Orange Line in Bangalore runs for 32.15km from J P Nagar 4th Phase in the south to Kempapura in the north. It passes through Mysore Road, Nagarabhavi, Peenya, Hebbal, and other key areas.
What is the difference between Metro Phases 3 and 3A?
The difference between Metro Phases 3 and 3A is that the former is approved and covers J P Nagar to Kempapura & Hosahalli to Kadabagere, while the latter is not approved yet and covers Sarjapur to Hebbal.
What is Namma Metro Phase 3 and which line is it?
Namma Metro Phase 3 is a 44.65km route connecting the western areas; and comprises the Orange Line from J P Nagar 4th Phase to Kempapura, and Grey Line from Hosahalli to Kadabagere.
When will Phase 3 of Bangalore Metro be completed?
Phase 3 of Bangalore Metro has a target opening of 2029 as per the Union Cabinet approval note. Tender execution periods and subsequent testing may influence the final commissioning schedule.
Which locales will get metro connectivity for the first time under Phase 3?
Locales that will get connectivity for the time under Phase 3 include Nagarabhavi, Sunkadakatte, Herohalli, Byadarahalli, and Kadabagere.
What are the interchange stations on Orange Line?
Interchange stations on Orange Line include J P Nagar 4th Phase, J P Nagar, Mysore Road, Sumanahalli Cross, and Hebbal – that link with the Pink, Green, Purple, Grey, and Blue lines.
What are double-decker metro corridors?
Double-decker metro corridors combine a vehicular flyover on the lower deck with rapid-transit tracks above it. The stacked structure uses a shared median for two transport levels.
How will Phase 3 impact property prices in west Bangalore?
Namma Metro Phase 3 real estate impact in west Bangalore will emerge through enhanced rail links, rental activity, and commercial expansion. Its extent may vary by distance from proposed stops, construction progress, and surrounding land use.
Is it a good time to buy flats near upcoming Orange Line stops?
Yes, it is a good time to buy flats near upcoming Orange Line stops, as Namma Metro Phase 3 real estate impact will include rental interest and location appeal. Individuals should assess execution timelines, distance from stations, developer record, and intended possession duration.